Evidence first, with a way out at every stage
We agree what success means before we fit anything, then test against simple methods, first principles and data the model has never seen.
Five stages. Formal review at every gate.
Each stage ends with a formal review gate, so you only commit to the next stage when the evidence supports moving forward.
-
Stage 1
Audit
Map your tags, check units and timestamps, and test whether the data can answer the question.
Gate Is the data fit for use?
-
Stage 2
Baseline
Agree success criteria up front, freeze a test period and score simple methods first.
Gate Is there room to beat the baseline?
-
Stage 3
Model
Fit the model and test it on data it has never seen, including its misses.
Gate Does it beat the baseline?
-
Stage 4
Shadow run
Run read-only forecasts alongside operations, with your engineers reviewing each one.
Gate Is it useful in practice?
-
Stage 5
Handover
Hand over the model, code, documentation and the conditions where it should not be trusted.
Gate Who owns it from here?
Physics-checked modelling
Fitting the data isn’t enough. Every data-driven model, surrogate and ROM is tested against first-principles checks before handover.
- Conservation
- Models are checked against mass and energy balance tolerances agreed at scoping.
- Physical limits
- Predictions must respect bounds such as temperatures, compositions and efficiencies that are physically possible.
- Correct response
- When an input moves, the output has to move the way the physics says it should.
- Full-model comparison
- Surrogates and ROMs are tested against the first-principles model on runs they never saw.
- Known range
- Every model documents its tested operating envelope and includes out-of-range indicators so engineers can see when inputs move beyond validated conditions.
Agreed before fitting
Choosing the pass mark after seeing the results would prove nothing, so we set it first.
- Target assets and operating modes
- The decision the model supports, and the lead time it needs
- The existing baseline or operating rule to beat
- Maximum missed events and false alarms
- Maximum useful uncertainty
- Number of independent test events required
Models that say when they don’t know
Outputs carry one of three states, and engineers keep ownership of every decision.
Simopts provides mathematical modelling and decision-support analytics, not licensed professional engineering (PE/PEng) design or safety-instrumented system certification. Qualified plant personnel remain responsible for reviewing outputs and making operational changes.
- Within validated conditions
- The plant is operating in a range the model was tested on.
- Review required
- Something looks unfamiliar. An engineer should check before relying on it.
- Insufficient evidence
- The model should not be used for this case.
What you keep
Upon completion, you own the project-specific model, custom code and documentation built for your asset. Any pre-existing general modelling utilities incorporated into the deliverables are provided on a perpetual, royalty-free basis for your internal use, and standard open-source libraries remain subject to their respective licences—with no recurring platform fees.
- A data dictionary and reproducible quality checks
- The model and its source code
- A comparison against simple baselines
- A failure atlas showing where forecasts went wrong
- A decision note: proceed, narrow the scope or stop
Data handling
- NDA first
- We execute a mutually agreed NDA before any project data is exchanged.
- Read-only & security
- Models work from offline historian exports or client-managed read-only feeds—we never require write access to control systems. OT/IT network security and access governance remain under your plant’s control.
- Your data stays yours
- Nothing is published or reused without your written agreement.
- Engineers decide
- Models inform decisions. They don’t act on the plant.