Plant models built on your data. No platform to buy.

We build first-principles models, soft sensors, forecasts and optimisers around your plant, from one defined problem to a full-scale project your engineers can check.

UNIT 100 // PREHEAT & FRACTIONATION · READ-ONLY MODEL
Process flow and physics-checked soft-sensor schematic Interactive schematic showing a crude preheat exchanger, three-phase separator, control valve, and fractionation column feeding temperature, pressure, and flow signals into a physics-checked soft-sensor estimate with uncertainty bounds and discrete lab samples. E-101 Preheat Exchanger V-102 Flash Separator FV-103 C-201 Fractionation Column E-202 E-203 TI 218 °C PI 14.2 bar FI 412 t/h Lab tap QY 201 SOFT-SENSOR ESTIMATE · QY-201 VALIDATED Spec floor 96 92 88 84 MASS BAL. 99.6% EXCH. DUTY 18.4 MW 95% BAND ±1.2% ENVELOPE IN RANGE Estimate 95% band Lab sample
Click a regime above to inspect how physics checks and uncertainty bounds respond to operating changes. Simulated schematic — not real plant data.

What are you hearing at your plant?

Soft-sensor proof of concept

Estimate a lab-measured quality between samples, using the signals you already record.

You get
A backtest on held-out data showing whether the estimate beats your current practice.
Engagement
Fixed-fee stage
See scope and deliverables

Sensor and mass-balance check

Find the meters and analysers that disagree with each other and with basic conservation.

You get
A ranked list of suspect instruments and the balance gaps behind each one.
Engagement
Fixed-fee stage
See scope and deliverables

Data and KPI audit

Map what you record, test whether it is fit for use, and tie it to the decisions that matter.

You get
A data-quality report and a short list of the projects your data can support.
Engagement
Fixed-fee stage
See scope and deliverables

Fouling or performance prediction

Forecast duty loss on exchangers and similar equipment from existing historian data.

You get
A forecast tested on past campaigns, with its misses and limits documented.
Engagement
Fixed-fee stage
See scope and deliverables

Surrogate or reduced-order model

Build a fast surrogate or reduced-order model of your simulation, validated against first principles.

You get
A fast model with its valid range, its error against the full model and its balance checks.
Engagement
Fixed-fee stage
See scope and deliverables

First-principles process models

Build process models from mass and energy balances, thermodynamics and kinetics, from one unit to a full-scale project.

You get
A process model scoped to your need, calibrated and tested against your plant data.
Engagement
Phased proposal
See scope and deliverables

Real-time optimisation

Use live plant data and a validated model to recommend better operating points as conditions change.

You get
Advisory recommendations, tested in a shadow run before anyone relies on them.
Engagement
Phased proposal
See scope and deliverables

Energy optimisation

Find where energy is lost across furnaces, heat recovery, steam and compression, and rank what to change.

You get
A ranked list of energy opportunities, calculated from your plant data with a model behind each.
Engagement
Phased proposal
See scope and deliverables

For consultancies

White-label subcontract

Modelling capacity for engineering consultancies, delivered under your name.

You get
Reviewable models and reports your team can present as its own.
Engagement
Work-package or rate card
See scope and deliverables

The capability of a platform, scoped to what you need.

Typical platformWorking with Simopts
Licence and long rolloutWork scoped to what you need, from one problem to a full-scale build
Book a demo to learn anythingClear scope and deliverables up front, with fixed-fee proposals after a short scoping call
Headline ROI percentagesTested against simple baselines and first principles, including where the model loses
You rent their productYou keep the project-specific model, custom code and report—no recurring platform licence.

Five stages. You can stop at any gate.

Each stage ends with a formal review gate, so you only commit to the next stage when the evidence supports moving forward.

  1. Stage 1

    Audit

    Map your tags, check units and timestamps, and test whether the data can answer the question.

    Gate Is the data fit for use?

  2. Stage 2

    Baseline

    Agree success criteria up front, freeze a test period and score simple methods first.

    Gate Is there room to beat the baseline?

  3. Stage 3

    Model

    Fit the model and test it on data it has never seen, including its misses.

    Gate Does it beat the baseline?

  4. Stage 4

    Shadow run

    Run read-only forecasts alongside operations, with your engineers reviewing each one.

    Gate Is it useful in practice?

  5. Stage 5

    Handover

    Hand over the model, code, documentation and the conditions where it should not be trusted.

    Gate Who owns it from here?

Our hybrid model lost this test. We publish that too.

We built an exchanger fouling benchmark on 88 synthetic campaigns. On 24 test campaigns shifted away from training conditions, Causal trend (a simple local trend baseline) achieved lower threshold-crossing timing error than Grey hybrid: 1.38 days MAE against 2.25 days.

Grey hybrid’s uncertainty band also averaged 44.65 K, too wide to plan a cleaning around. This is why every project scores simple methods first.

Read the fouling case study
Simulated data

Threshold-crossing timing error on shifted campaigns

Mean absolute timing error (MAE, days) across 24 shifted synthetic test campaigns. Lower is better. Expand the table for outlet temperature RMSE (K) and interval width.

  1. Causal trend 1.38 Causal trend Timing MAE 1.38 days Outlet temp. RMSE 1.70 K Mean band width 8.86 K
  2. Grey hybrid 2.25 Grey hybrid Timing MAE 2.25 days Outlet temp. RMSE 1.72 K Mean band width 44.65 K
  3. White hybrid 3.17 White hybrid Timing MAE 3.17 days Outlet temp. RMSE 1.53 K Mean band width 8.26 K
  4. Black hybrid 3.23 Black hybrid Timing MAE 3.23 days Outlet temp. RMSE 2.05 K Mean band width 7.99 K
  5. Fixed rate 5.85 Fixed rate Timing MAE 5.85 days Outlet temp. RMSE 2.59 K Mean band width 10.72 K
  6. Direct ML 15.15 Direct ML Timing MAE 15.15 days Outlet temp. RMSE 5.87 K Mean band width 9.78 K
View full metrics table
Method Timing MAE (days) Outlet temp. RMSE (K) Mean band width (K) Simultaneous coverage
Causal trend 1.38 1.70 8.86 96%
Grey hybrid 2.25 1.72 44.65 100%
White hybrid 3.17 1.53 8.26 98%
Black hybrid 3.23 2.05 7.99 78%
Fixed rate 5.85 2.59 10.72 80%
Direct ML 15.15 5.87 9.78 19%

5 model seeds on one synthetic fleet. Persistence is left out because it never predicted a crossing, so it has no timing error.

Physics-checked modelling.

Every data-driven model, surrogate and ROM is tested against first-principles checks before handover.

Conservation
Models are checked against mass and energy balance tolerances agreed at scoping.
Physical limits
Predictions must respect bounds such as temperatures, compositions and efficiencies that are physically possible.
Correct response
When an input moves, the output has to move the way the physics says it should.
Full-model comparison
Surrogates and ROMs are tested against the first-principles model on runs they never saw.
Known range
Every model documents its tested operating envelope and includes out-of-range indicators so engineers can see when inputs move beyond validated conditions.

Your plant data is treated as confidential.

NDA first
We execute a mutually agreed NDA before any project data is exchanged.
Read-only & security
Models work from offline historian exports or client-managed read-only feeds—we never require write access to control systems. OT/IT network security and access governance remain under your plant’s control.
Your data stays yours
Nothing is published or reused without your written agreement.
Engineers decide
Models inform decisions. They don’t act on the plant.

What engineers usually ask.

Can you build a full process model from scratch?

Yes. We build first-principles models to the size you need, from a single unit to a full-scale project.

How do you know an AI model is physically sound?

We check it against first principles: conservation of mass and energy, physical limits and the direction of its response. Surrogates and ROMs are also compared with the full model.

Does real-time optimisation change our setpoints?

No. It recommends operating points from a read-only feed, and your engineers decide what to change.

Do we need to buy any software?

No. You keep the project-specific model, custom code and report—no recurring platform licence.

How long does a project take?

An audit is short. A forecasting study on one to three assets is typically planned at four to eight weeks, depending on the state of the data.

What if our data isn’t good enough?

That is what the audit is for. If the data can’t support the work, we say so and recommend a narrower study or stop there.

What if a simple method beats the model?

Then that is the result, and we’ll tell you. A simple method you can trust beats a complex one you can’t.

Do you work outside oil and gas?

No. We focus on upstream, midstream, gas processing, LNG and refining.

Tell us what you’re hearing at your plant.

Start a project